Report No.

1772
Weatherford Verification Report

Type of audit

External Audits
Weatherford

Auditee/Customer

Weatherford
PGNIG Upstream Norway

Date

2019/08/01

2321 days ago

Findings

2
Number of findings

Status

Closed
External Audits


Weatherford Verification Report
Summary

Following this year’s planned Shrek exploration well for PGNiG, a verification of Weatherford P&A and liner hanger departments was performed to ensure a high level of quality and commitment to deliver a first-class performance for the Shrek well.

Findings

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Check maximum length of basket allowed shipped to the rig. If allowable basket length is sufficient, evaluate to stuff the liner plugs onshore based on the timing of the job and shipment of equipment.

    Responsible for follow up: Øystein Prytz (Well Expertise). Max length: 18-20 m and up to 22 m, dependent of free space on riser deck and weather. Action closed.

  • Improvement

    Closed


    Closed


    Deadline was:

    The operation management system for P&A incl. all steps and interfaces in planning face such as design review, WO, risk assessment, transfer of experience. However, the access is through a database, not a web- based system available for offshore crew.

    Weatherford should evaluate web-based system such as PROM TRS planning database. Improvement proposal included in Weatherford verification report sent to Weatherford.

    N/A



Additional Documentation

PGNiG-Weatherford-verification-01.08.19Signed.pdf


PGNiG-Weatherford-verification-01.08.19Signed.pdf




New Audit Report

You do not have permission to view this form.


\n


Weatherford

No person selected

Report No.

1772
Weatherford Verification Report

Type of audit

External Audits
Weatherford

Auditee/Customer

Weatherford
PGNIG Upstream Norway

Date

2019/08/01

2321 days ago

Findings

2
Number of findings

Status

Closed
External Audits


Weatherford Verification Report
Summary

Following this year’s planned Shrek exploration well for PGNiG, a verification of Weatherford P&A and liner hanger departments was performed to ensure a high level of quality and commitment to deliver a first-class performance for the Shrek well.

Findings

  • Actions

    Closed


    Closed


    Deadline was:

    Follow up action only.

    Check maximum length of basket allowed shipped to the rig. If allowable basket length is sufficient, evaluate to stuff the liner plugs onshore based on the timing of the job and shipment of equipment.

    Responsible for follow up: Øystein Prytz (Well Expertise). Max length: 18-20 m and up to 22 m, dependent of free space on riser deck and weather. Action closed.

  • Improvement

    Closed


    Closed


    Deadline was:

    The operation management system for P&A incl. all steps and interfaces in planning face such as design review, WO, risk assessment, transfer of experience. However, the access is through a database, not a web- based system available for offshore crew.

    Weatherford should evaluate web-based system such as PROM TRS planning database. Improvement proposal included in Weatherford verification report sent to Weatherford.

    N/A



Additional Documentation

PGNiG-Weatherford-verification-01.08.19Signed.pdf


PGNiG-Weatherford-verification-01.08.19Signed.pdf



\n”}}]}]}]},{“type”:”section”,”props”:{“class”:”uk-hidden”,”id”:”newreport”,”image_position”:”center-center”,”padding”:”none”,”style”:”default”,”title_breakpoint”:”xl”,”title_position”:”top-left”,”title_rotation”:”left”,”vertical_align”:””,”width”:”default”},”children”:[{“type”:”row”,”children”:[{“type”:”column”,”props”:{“image_position”:”center-center”,”position_sticky_breakpoint”:”m”},”children”:[{“type”:”html”,”props”:{“content”:”